Drill depth
|
350-60m
|
Borehole diameter
|
¢110-¢600mm
|
Drill pipe diameter
|
¢50-¢127mm
|
Power head speed
|
Low speed (front and back) 7-233r/min High speed (front and back) 16-540r/min
|
Provide progress for power head
|
3500mm
|
Electric power of the power head
|
30kw
|
Main winch
|
Single rope lifting capacity 30kN
|
Pay for the winch
|
Single rope lifting capacity 20Kn
|
Drilling tower height
|
12m
|
Drilling tower load
|
180kN
|
Mud circulation pump
|
BW-250 BW-600
|
Hydraulic pipe twisting machine through-hole diameter
|
¢450mm
|
Unscrew the diameter of the drill pipe or casing
|
¢50、¢127、¢178mm、Shackle torque 2.2kN.m
|
Outline dimensions for host installation
|
Length×Width×Height 2800×1500×5800mm
|
Drill weight
|
6500kg
|